86 Intermediate Superheater Assemblies

Minnesota

A 55 megawatt renewable energy power plant needed to replace 86 intermediate super heater assemblies.

The boiler at the facility is a Foster Wheeler design that went into operation approximately 2007. The boiler is a natural circulation, superheated, balanced draft design, single furnace, stoker fired unit firing biomass, including poultry litter. The boiler is rated to produce steam for a steam turbine generator rated approximately 55 MW. The boiler produces 490,000 pph of steam at 1,555 psig and 980 °F.

The Superheater
Scope of Work
  • Field Inspection
  • Engineering (Installation/arrangement and shop fabrication drawings)
  • Material procurement
  • Fabricate 86 intermediate superheater pendants complete with 360 degree Inconel weld overlay in lieu of tube shields, S.S. hand-cuff tube supports, and all solid ties.
  • HB Field Services performed the demo and installation on the new elements.
Detailed engineering drawing of a boiler unit, including components, dimensions, and part specifications for manufacturing.

Contact Us Today

(978) 683-7244

Call now

Ready to Start Your Next Project

with Helfrich Brothers?

Ready to Start Your Next Project with Helfrich Brothers?

Get Started Today
CERTIFICATIONS
ASME S Certification ASME U Certification ASME H Certification ASME PP Certification
NB Certification R Certification CE Certification